I took the videos below during the 2/16/08 Shorewood School District referendum informational tours. Shorewood Superintendent Blane McCann gives the full tour of the key spaces which would be affected by the referendum.
The video is split up into 4 parts: Intro, Library, PE Building, and Pool. I am also working on obtaining the architectural plans for the Library and PE Building spaces so you can get a better sense of the proposed renovations. The maximum video length for YouTube uploads in 10 minutes, so you will notice editing in some places.
If you experience problems viewing them, please let me know. There may a download speed issue. If so, I will see if I can reduce the quality of the video to make them play more smoothly.
REFERENDUM INTRODUCTION & BACKGROUND (9 mins 51 sec)
SHS LIBRARY TOUR (2 mins 55 sec)
SHS PHYSICAL EDUCATION BUILDING TOUR (8 mins 32 sec)
SHS POOL TOUR (1 min 35 sec)
We have a newer system and had no problems d/ling or viewing the videos; might not be the same for other readers, though! Thanks for the work involved in getting those up on the blog; lots of good information!
BTW, I know it isn't mentioned anywhere in the videos, but have you heard anything involving the library, phy. ed. building or pool improvements mentioning 'a dome'? *wink*
The school district sent me several renderings of the proposed renovations to the SHS Library and PE